TPM Team Guide /
I tiakina i:
| Kaituhi matua: | |
|---|---|
| Hōputu: | Pukapuka |
| Reo: | Ingarihi |
| I whakaputaina: |
Portland, EUA :
Productivity,
1995, c1995
|
| Rangatū: | (Shopfloor)
|
| Ngā marau: | |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
MARC
| LEADER | 00000nam^a2200000^a^4500 | ||
|---|---|---|---|
| 001 | 000136634 | ||
| 005 | 20250521000000.0 | ||
| 009 | 20260310095326.272 | ||
| 020 | |a 1-56327-079-X | ||
| 037 | |a Acervo ITESO - Biblioteca | ||
| 041 | |a ING | ||
| 082 | |a 658. 202 |b SHI | ||
| 100 | |a Shirose, Kunio |e (ed.) | ||
| 245 | 1 | 0 | |a TPM Team Guide / |c Ed. y pról. de K. Shirose ; notas de Norman Bodek ; tr. por Andrew P. Dillon. |
| 264 | 4 | |a Portland, EUA : |b Productivity, |c 1995, c1995 | |
| 300 | |a XIV, 155 p. | ||
| 336 | |a texto |b txt |2 rdacontenido | ||
| 337 | |a sin mediación |b n |2 rdamedio | ||
| 338 | |a volumen |b nc |2 rdasoporte | ||
| 440 | 1 | |a (Shopfloor) | |
| 500 | |a Traducción de: TPM shoshudan: Katsudo no susumekata | ||
| 649 | |a XX | ||
| 650 | |a TPM (Total Productive Maintenance) | ||
| 650 | |a Calidad Total | ||
| 650 | |a Control de Calidad | ||
| 650 | |a Mantenimiento Industrial | ||
| 650 | |a Planeación de una Industria | ||
| 650 | |a Seguridad Industrial | ||
| 650 | |a Productividad | ||
| 650 | |a Proceso de Producción | ||
| 650 | |a Diseño Industrial | ||
| 650 | |a Ingeniería Industrial | ||
| 650 | |a Administración | ||
| 650 | |a Ciencias Administrativas | ||
| 910 | |a Fondo General | ||
| 920 | |a Impresos - Libros | ||
| 930 | |a Colección General | ||
| 905 | |a 101 | ||
| 901 | |a 0500065366 |b IT1 |c ACC |u 20250521 | ||
| 902 | |a https://opac.biblio.iteso.mx/vufind/Record/000136634 | ||